<- Back to Suppliers

Supplier Profile

Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd.

福建中天交通工程技术服务有限公司

Fujian Zhongtian provides shield tunneling risk control services, specialized shield materials and equipment, two-component grouting systems, tunnel ventilation solutions, and technical support for complex tunnel projects.

福建中天交通提供盾构施工风险控制、盾构专用材料与设备、同步双液注浆系统、隧道通风解决方案及复杂隧道工程现场技术服务。

View Offerings
Company technology and product cover image
Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd. logo

Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd.

Fuzhou, Fujian, China

Overview

Company profile

Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd. provides construction consulting, specialized materials, equipment supply, construction method development, and on-site technical services for tunnel and shield tunneling projects. Its focus areas include settlement control for risk-sensitive shield tunneling crossings, muck conditioning, anti-gushing, mud cake prevention and removal, two-component grouting, grouting monitoring, long tunnel ventilation, and shield grease agency supply.

Public-facing content should emphasize integrated risk control, combined material and equipment solutions, and project-based technical services. Exclusive claims, academic-team claims, project-count claims, and agency-brand wording should be manually reviewed before publication.

公司简介

福建中天交通工程技术服务有限公司面向隧道与盾构工程提供施工咨询、材料供应、专用设备供应、工法研发和现场技术服务。其业务重点包括盾构下穿风险源沉降控制、渣土改良、防喷涌、泥饼防治、同步双液注浆、同步注浆监测、长大隧道通风和盾构油脂代理供应。

公司前台展示应突出综合风险控制、材料装备结合和项目化技术服务能力。涉及排他性、院士团队、项目数量和代理品牌身份的表述需在发布前人工复核。

Core Capabilities

  • Shield tunnelling risk-control consulting

    盾构施工风险控制咨询

  • Settlement control for shield tunnelling beneath sensitive structures

    盾构下穿敏感结构沉降控制

  • Shield tunnelling material and equipment supply

    盾构施工材料与设备供应

  • Clay Shock method technical services

    克泥效工法技术服务

  • Muck conditioning and anti-gushing solutions

    渣土改良与防喷涌解决方案

  • Synchronous grouting monitoring and ventilation support

    同步注浆监测与隧道通风支持

Company Images

Visual materials provided by the supplier, including company facilities, equipment, certificates, and project scenes.

Supplier Offerings

Products, services, systems, and solutions from this supplier

The following offerings are organized from this supplier's available company information, service scope, and engineering capabilities.

View Products & Services
Clay Shock proportion adjustment image

MATERIALS

Clay Shock Settlement Control and Gap-Filling Materials

克泥效沉降控制与间隙填充材料

Clay Shock and Clay Shock Slurry materials for settlement control, gap filling, water stopping, and emergency remediation during shield tunneling through unstable or water-rich strata

用于盾构穿越不稳定地层或富水地层时进行沉降控制、间隙填充、止水和应急处置的克泥效及克泥效脂材料

Clay Shock MethodSettlement ControlGap FillingShield UndercrossingRisk-Sensitive StructuresGround Loss Control
Two-component grouting equipment

EQUIPMENT

FJZT-DSF Two-Component Backfill Grout Batching Plant

FJZT-DSF同步双液自动制浆站

Fully automated batching plant for two-component backfill grout production, mixing, delivery, and tail void filling during shield tunneling.

用于盾构施工同步双液注浆浆液制备、搅拌、输送及盾尾空隙填充的全自动制浆设备.

Two-Component GroutingBackfill Grout PlantAutomatic BatchingSynchronous GroutingShield Tunnelling EquipmentGrout Quality Control
EF

Offering

Image to be added

MATERIALS

Rapid Setting Effect and Stabilizer Materials for Muck and Grout Conditioning

速凝效与稳定剂渣土及浆液调控材料

Rapid Setting Effect and stabilizer materials for muck conditioning, anti-gushing control, grout workability retention, and long-distance pumping in shield tunneling and grouting works

用于盾构渣土改良、防喷涌控制、浆液工作性保持和长距离泵送的速凝效与稳定剂材料

Rapid Setting EffectStabilizer MaterialsMuck ConditioningGrout ConditioningAnti-Gushing ControlShield Tunnelling Materials
Zhongtian forced stripping agent

INTEGRATED SOLUTIONS

Mud Cake Prevention and Removal Solutions

刀盘泥饼防治与清除解决方案

Integrated anti-mud cake solution covering mud cake inhibitor, cutterhead anti-mud cake coating, forced stripping agent, and mud cake removal snake robot

集泥饼阻隔剂、刀盘防泥饼涂层、剥除剂和清除泥饼蛇形机器人于一体的盾构泥饼防治与清除方案

Mud Cake PreventionCutterhead CleaningShield Tunnelling Risk ControlMuck ConditioningAdhesive Ground TreatmentTunnelling Support
EF

Offering

Image to be added

INSPECTION & MONITORING

Synchronous Grouting Monitoring System

同步注浆监测系统

GPR-based synchronous grouting monitoring system for dynamic quality monitoring of shield tunnel backfill grouting and detection of voids behind segment linings

基于无线探地雷达的同步注浆质量动态监测系统,用于盾构壁后注浆质量监测和管片背后空洞检测

Synchronous GroutingGrouting MonitoringBackfill Quality ControlSegment Floating ControlShield Tunnelling DataGrout Pressure Monitoring
ZITRON ventilation fan image

EQUIPMENT

Tunnel Ventilation Solutions and ZITRON Fan Agency Services

隧道通风解决方案与ZITRON风机代理服务

Tunnel construction ventilation solutions and ZITRON fan agency services for long and large tunnel projects, including temporary ventilation during TBM and drill-and-blast tunnel construction

面向长大隧道工程的施工通风解决方案及ZITRON驭铁龙风机代理服务,适用于TBM和钻爆法隧道施工临时通风场景

Tunnel VentilationZITRON FansLong Tunnel VentilationConstruction VentilationVentilation System SupportTunnel Safety

Contact EngiFind

Interested in this supplier?

Contact this supplier directly where contact information is available, or use EngiFind for platform support and supplier matching assistance.

Platform Support