Home/Products & Services/Tunnel Ventilation Solutions and ZITRON Fan Agency Services

ZITRON ventilation fan image

Engineering Service

Tunnel Ventilation Solutions and ZITRON Fan Agency Services

隧道通风解决方案与ZITRON风机代理服务

Tunnel construction ventilation solutions and ZITRON fan agency services for long and large tunnel projects, including temporary ventilation during TBM and drill-and-blast tunnel construction

面向长大隧道工程的施工通风解决方案及ZITRON驭铁龙风机代理服务,适用于TBM和钻爆法隧道施工临时通风场景

Supplied by Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd.

View Supplier Profile

Overview

Service overview

Fujian Zhongtian is an agency partner for ZITRON ventilation equipment in mainland China. The company provides tunnel ventilation solutions and equipment supply for long and large tunnel projects, including temporary ventilation during construction. Representative applications include ultra-long single-headed tunnel ventilation and large-diameter shield tunnel projects.

福建中天交通是ZITRON驭铁龙通风设备在中国大陆的代理合作方,为长大隧道工程提供施工通风方案和设备供应服务,覆盖施工期临时通风等场景。代表性应用包括超长距离独头掘进通风及超大直径盾构隧道项目通风服务。

Scope

Service scope

Key components that may be provided for relevant engineering scenarios.

  • ZITRON fan agency services
  • Ventilation solution design for long tunnel projects
  • Experience with over 200 long tunnel ventilation projects in China
  • Experience in ultra-long single-headed ventilation applications
  • Equipment selection support
  • Project-based technical support
  • ZITRON驭铁龙风机代理服务
  • 长大隧道通风方案设计
  • 国内200多条长大隧道通风项目经验
  • 超长距离独头通风应用经验
  • 通风设备选型支持
  • 项目化技术支持

Scenarios

Applicable project scenarios

Typical project conditions where this offering may be relevant.

  • Temporary ventilation for long tunnels
  • TBM tunnel construction ventilation
  • Drill-and-blast tunnel ventilation
  • Large-diameter shield tunnel ventilation
  • Water diversion tunnel construction
  • Railway and highway tunnel construction
  • 长大隧道施工临时通风
  • TBM隧道施工通风
  • 钻爆法隧道施工通风
  • 大直径盾构隧道通风
  • 引水隧洞施工
  • 铁路与公路隧道施工

Technical Information

Technical parameters

  • Representative project: Central Yunnan Water Diversion Xianglushan Tunnel.
  • Ventilation distance: 25,000 m.
  • Fan diameter: 2000 mm.
  • Total power: 1260 kW.
  • Return air velocity: 0.5 m/s.
  • Representative project: Beijing East Sixth Ring Road Tunnel.
  • Fan model: ZVN1-14-132/4.
  • Fan diameter: 1400 mm.
  • Total power: 528 kW.
  • Ventilation distance: 5050 m.

技术参数

  • 代表项目:滇中引水香炉山隧道。
  • 通风距离:25000 m。
  • 风机直径:2000 mm。
  • 总功率:1260 kW。
  • 回风速:0.5 m/s。
  • 代表项目:北京东六环隧道。
  • 风机型号:ZVN1-14-132/4。
  • 风机直径:1400 mm。
  • 总功率:528 kW。
  • 通风距离:5050 m。

Supplier Offerings

Other offerings from this supplier

Clay Shock proportion adjustment image

MATERIALS

Clay Shock Settlement Control and Gap-Filling Materials

克泥效沉降控制与间隙填充材料

Clay Shock MethodSettlement ControlGap FillingShield UndercrossingRisk-Sensitive StructuresGround Loss Control

View Details

Two-component grouting equipment

EQUIPMENT

FJZT-DSF Two-Component Backfill Grout Batching Plant

FJZT-DSF同步双液自动制浆站

Two-Component GroutingBackfill Grout PlantAutomatic BatchingSynchronous GroutingShield Tunnelling EquipmentGrout Quality Control

View Details

MATERIALS

Rapid Setting Effect and Stabilizer Materials for Muck and Grout Conditioning

速凝效与稳定剂渣土及浆液调控材料

Rapid Setting EffectStabilizer MaterialsMuck ConditioningGrout ConditioningAnti-Gushing ControlShield Tunnelling Materials

View Details

Zhongtian forced stripping agent

INTEGRATED SOLUTIONS

Mud Cake Prevention and Removal Solutions

刀盘泥饼防治与清除解决方案

Mud Cake PreventionCutterhead CleaningShield Tunnelling Risk ControlMuck ConditioningAdhesive Ground TreatmentTunnelling Support

View Details

INSPECTION & MONITORING

Synchronous Grouting Monitoring System

同步注浆监测系统

Synchronous GroutingGrouting MonitoringBackfill Quality ControlSegment Floating ControlShield Tunnelling DataGrout Pressure Monitoring

View Details