Home/Products & Services/FJZT-DSF Two-Component Backfill Grout Batching Plant

Two-component grouting equipment

Product Offering

FJZT-DSF Two-Component Backfill Grout Batching Plant

FJZT-DSF同步双液自动制浆站

Fully automated batching plant for two-component backfill grout production, mixing, delivery, and tail void filling during shield tunneling.

用于盾构施工同步双液注浆浆液制备、搅拌、输送及盾尾空隙填充的全自动制浆设备.

Supplied by Fujian Zhongtian Traffic Engineering Technology Service Co., Ltd.

View Supplier Profile

Overview

Product overview

The FJZT-DSF automatic batching plant is designed for two-component backfill grout used in shield tunneling. It consists of powder silos, a clean water tank, a stabilizer storage tank, an A-component mixing and preparation unit, an A-component delivery unit, and an automated control system. The system supports precise proportioning, uniform mixing, efficient operation, and controlled grout quality for filling the tail void and reducing ground settlement.

FJZT-DSF同步双液自动制浆站面向盾构施工同步双液注浆应用,系统由粉料仓、清水箱、稳定剂储罐、A液搅拌制备单元、A液输送单元及自动控制系统等组成。设备可实现精确配比、均匀搅拌、高效运行和浆液质量控制,用于盾尾空隙填充并降低地层沉降风险。

Applications

Typical applications

  • Two-component backfill grouting
  • Shield tail void filling
  • Settlement control during shield tunneling
  • Large-diameter shield tunnel construction
  • Underground trailer-mounted grout station applications
  • Ground batching plant with grout transport vehicles
  • 同步双液注浆
  • 盾尾空隙填充
  • 盾构施工沉降控制
  • 大直径盾构隧道施工
  • 地下拖车式制浆站应用
  • 地面制浆站与浆液运输车应用

Features

Key product features

  • Fully automated control with one-button start and stop
  • Precise proportioning
  • Uniform mixing
  • Efficient operation
  • Strong adaptability
  • High-quality grout preparation
  • Material saving
  • Safe and reliable operation
  • 全自动控制,一键启停
  • 精确配比
  • 均匀搅拌
  • 高效运行
  • 适应性强
  • 高质量浆液制备
  • 节约材料
  • 运行安全可靠

Technical Information

Technical parameters

  • System components: Powder silos, clean water tank, stabilizer tank, A-component mixing unit, A-component delivery unit, control system.
  • Grout type: Two-component A/B backfill grout.
  • Typical application: Tail void filling during shield tunneling.
  • Representative projects: Jinan Huanggang Road Yellow River Crossing Tunnel, Jingjiang Yangtze River Tunnel, Guangzhou Baiyun Airport Underpass, Beijing East Sixth Ring Road.

技术参数

  • 系统组成:粉料仓、清水箱、稳定剂储罐、A液搅拌制备单元、A液输送单元、控制系统。
  • 浆液类型:A/B型同步双液注浆浆液。
  • 典型应用:盾构施工盾尾空隙填充。
  • 代表项目:济南黄岗路黄河隧道、靖江长江隧道、广州白云机场下穿通道、北京东六环隧道。

Supplier Offerings

Other offerings from this supplier

Clay Shock proportion adjustment image

MATERIALS

Clay Shock Settlement Control and Gap-Filling Materials

克泥效沉降控制与间隙填充材料

Clay Shock MethodSettlement ControlGap FillingShield UndercrossingRisk-Sensitive StructuresGround Loss Control

View Details

MATERIALS

Rapid Setting Effect and Stabilizer Materials for Muck and Grout Conditioning

速凝效与稳定剂渣土及浆液调控材料

Rapid Setting EffectStabilizer MaterialsMuck ConditioningGrout ConditioningAnti-Gushing ControlShield Tunnelling Materials

View Details

Zhongtian forced stripping agent

INTEGRATED SOLUTIONS

Mud Cake Prevention and Removal Solutions

刀盘泥饼防治与清除解决方案

Mud Cake PreventionCutterhead CleaningShield Tunnelling Risk ControlMuck ConditioningAdhesive Ground TreatmentTunnelling Support

View Details

INSPECTION & MONITORING

Synchronous Grouting Monitoring System

同步注浆监测系统

Synchronous GroutingGrouting MonitoringBackfill Quality ControlSegment Floating ControlShield Tunnelling DataGrout Pressure Monitoring

View Details

ZITRON ventilation fan image

EQUIPMENT

Tunnel Ventilation Solutions and ZITRON Fan Agency Services

隧道通风解决方案与ZITRON风机代理服务

Tunnel VentilationZITRON FansLong Tunnel VentilationConstruction VentilationVentilation System SupportTunnel Safety

View Details