North Bund Subdistrict East Daming Warehouse underground-space development, renovation and protection project.
Engineering Service
Urban Underground Space Development and In-situ Underpinning Services
城市地下空间开发与原位托换服务
Technical services for underground-space development in urban core areas, historic districts, protected building groups and dense existing-building areas, covering in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination.
面向城市核心区、历史街区、保护建筑群和既有建筑密集区域,提供地下空间开发配套的原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合等技术服务。
Supplied by Shanghai Zhitongxing Urban Renewal Construction Co., Ltd.
Overview
Service overview
This service addresses underground-space development needs in urban core areas, historic districts, protected building groups and dense existing-building areas. It provides technical services including in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination. The objective is to enable underground-space development, functional renewal and intensive urban land use while retaining existing buildings, heritage buildings or protected buildings and safeguarding their original appearance and structural safety.
该服务面向城市核心区、历史街区、保护建筑群和既有建筑密集区域的地下空间开发需求,提供原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合等技术服务。服务目标是在保留既有建筑、文物历史建筑或保护建筑原貌与结构安全的前提下,实现地下空间开发、功能更新和城市土地集约利用。
Scope
Service scope
Key components that may be provided for relevant engineering scenarios.
- The service focuses on enabling underground-space development and functional renewal through in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination while preserving the original appearance and structural safety of existing, heritage or protected buildings
- 服务重点是在保留既有建筑、文物历史建筑或保护建筑原貌与结构安全的前提下,通过原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合,实现地下空间开发与功能更新
Scenarios
Applicable project scenarios
Typical project conditions where this offering may be relevant.
- Underground-space development in urban core areas
- underground-space renewal in historic districts
- retention and reuse of protected building groups
- foundation conversion in dense existing-building areas
- in-situ underpinning
- temporary support
- load transfer
- structural protection
- 城市核心区地下空间开发
- 历史街区地下空间更新
- 保护建筑群保留利用
- 既有建筑密集区域基础转换
- 原位托换
- 临时支撑
- 荷载转移
- 结构保护
Offering Details
Technical Details & Applications
Representative Project References
Company project: North Bund Subdistrict East Daming Warehouse underground-space development, renovation and protection project. The project involved a district-level heritage building. In-situ underpinning technology was adopted to enable underground-space development on both sides while strictly protecting the original appearance of the heritage building.
Company project: Jianguo East Road No. 69 plot heritage building restoration construction monitoring project. In-situ foundation underpinning was carried out for parts of the walls of 8 buildings, and full-process automated monitoring was implemented, providing data support for in-situ foundation underpinning, heritage building restoration and construction control.
Previous representative project of the core team: Zhangyuan urban renewal underground-space development project. This project involved the largest group-type Shikumen building restoration-by-return project in China. It included district-level heritage buildings, 4 building groups and a total area of 10,010 m². Under highly constrained space conditions, the buildings were first translated and rotated to an intermediate position, and then moved back to their original location after underground-space development.
Previous representative project of the core team: Zhonghai Hengchang Jiuli heritage building jacking and underpinning project. The project developed underground space through in-situ foundation underpinning. It involved 8 buildings with a total area of 7,528.7 m², a total lifting load of 13,800 tonnes, a lifting height of 1.68 m and a lowering height of 0.8 m.
技术说明与应用案例
代表项目参考
公司案例:北外滩街道东大名仓库地下空间开发及改造保护项目 项目为区文保建筑,采用原位托换技术,在严格保护文物原貌的同时,同步实现两侧地下空间开发。
公司案例:建国东路69号地块文保修缮工程施工监测项目 项目对8栋建筑的部分墙体进行原位基础托换,并实施全过程自动化监测,为原位基础托换、文保修缮和施工控制提供数据支撑。
核心团队既往代表案例:张园城市更新地下空间开发项目 国内体量最大的组团式石库门建筑群归位工程,区级文保建筑,共4个组团,总面积10010平方米,空间狭小,先平移旋转至中间位置,地下空间开发后移回原位。
核心团队既往代表案例:中海恒昌玖里文保顶托工程 项目通过原位基础托换方式开发地下空间,共涉及8栋建筑,总面积7528.7㎡,提升总吨位13800吨,提升高度1.68m,降落0.8m。
Related Products & Solutions
关联产品与解决方案
Automatically selected based on supplier, category, keywords and offering type.
PROFESSIONAL SERVICES
Construction Monitoring for Jacking, Underpinning and Urban Renewal Projects
顶升、托换与城市更新施工监测服务
View Details
PROFESSIONAL SERVICES
Existing Building Jacking, Translation and Underpinning Services
既有建筑顶升、平移与托换服务
View Details
PROFESSIONAL SERVICES
Heritage and Historic Building Restoration and Structural Strengthening Services
文物及历史建筑修缮与结构加固服务
View Details