North Bund Subdistrict East Daming Warehouse underground-space development, renovation and protection project.

Engineering Service

Urban Underground Space Development and In-situ Underpinning Services

城市地下空间开发与原位托换服务

Technical services for underground-space development in urban core areas, historic districts, protected building groups and dense existing-building areas, covering in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination.

面向城市核心区、历史街区、保护建筑群和既有建筑密集区域,提供地下空间开发配套的原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合等技术服务。

Supplied by Shanghai Zhitongxing Urban Renewal Construction Co., Ltd.

View Supplier Profile

Overview

Service overview

This service addresses underground-space development needs in urban core areas, historic districts, protected building groups and dense existing-building areas. It provides technical services including in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination. The objective is to enable underground-space development, functional renewal and intensive urban land use while retaining existing buildings, heritage buildings or protected buildings and safeguarding their original appearance and structural safety.

该服务面向城市核心区、历史街区、保护建筑群和既有建筑密集区域的地下空间开发需求,提供原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合等技术服务。服务目标是在保留既有建筑、文物历史建筑或保护建筑原貌与结构安全的前提下,实现地下空间开发、功能更新和城市土地集约利用。

Scope

Service scope

Key components that may be provided for relevant engineering scenarios.

  • The service focuses on enabling underground-space development and functional renewal through in-situ underpinning, foundation conversion, temporary support, load transfer, structural protection, jacking control and construction monitoring coordination while preserving the original appearance and structural safety of existing, heritage or protected buildings
  • 服务重点是在保留既有建筑、文物历史建筑或保护建筑原貌与结构安全的前提下,通过原位托换、基础转换、临时支撑、荷载转移、结构保护、顶升控制和施工监测配合,实现地下空间开发与功能更新

Scenarios

Applicable project scenarios

Typical project conditions where this offering may be relevant.

  • Underground-space development in urban core areas
  • underground-space renewal in historic districts
  • retention and reuse of protected building groups
  • foundation conversion in dense existing-building areas
  • in-situ underpinning
  • temporary support
  • load transfer
  • structural protection
  • 城市核心区地下空间开发
  • 历史街区地下空间更新
  • 保护建筑群保留利用
  • 既有建筑密集区域基础转换
  • 原位托换
  • 临时支撑
  • 荷载转移
  • 结构保护

Offering Details

Technical Details & Applications

Representative Project References

Company project: North Bund Subdistrict East Daming Warehouse underground-space development, renovation and protection project. The project involved a district-level heritage building. In-situ underpinning technology was adopted to enable underground-space development on both sides while strictly protecting the original appearance of the heritage building.

Company project: Jianguo East Road No. 69 plot heritage building restoration construction monitoring project. In-situ foundation underpinning was carried out for parts of the walls of 8 buildings, and full-process automated monitoring was implemented, providing data support for in-situ foundation underpinning, heritage building restoration and construction control.

Previous representative project of the core team: Zhangyuan urban renewal underground-space development project. This project involved the largest group-type Shikumen building restoration-by-return project in China. It included district-level heritage buildings, 4 building groups and a total area of 10,010 m². Under highly constrained space conditions, the buildings were first translated and rotated to an intermediate position, and then moved back to their original location after underground-space development.

Previous representative project of the core team: Zhonghai Hengchang Jiuli heritage building jacking and underpinning project. The project developed underground space through in-situ foundation underpinning. It involved 8 buildings with a total area of 7,528.7 m², a total lifting load of 13,800 tonnes, a lifting height of 1.68 m and a lowering height of 0.8 m.

技术说明与应用案例

代表项目参考

公司案例:北外滩街道东大名仓库地下空间开发及改造保护项目 项目为区文保建筑,采用原位托换技术,在严格保护文物原貌的同时,同步实现两侧地下空间开发。

公司案例:建国东路69号地块文保修缮工程施工监测项目 项目对8栋建筑的部分墙体进行原位基础托换,并实施全过程自动化监测,为原位基础托换、文保修缮和施工控制提供数据支撑。

核心团队既往代表案例:张园城市更新地下空间开发项目 国内体量最大的组团式石库门建筑群归位工程,区级文保建筑,共4个组团,总面积10010平方米,空间狭小,先平移旋转至中间位置,地下空间开发后移回原位。

核心团队既往代表案例:中海恒昌玖里文保顶托工程 项目通过原位基础托换方式开发地下空间,共涉及8栋建筑,总面积7528.7㎡,提升总吨位13800吨,提升高度1.68m,降落0.8m。