Construction Solutions for Metro Entrances and Underground Passages
地铁出入口与地下通道施工解决方案
Construction solutions for metro entrances, underground pedestrian crossings, and underground connecting passages.
面向地铁出入口、人行过街通道和地下连接通道的施工解决方案。
Supplied by DunGou ShanHe (Anhui) Technology Services Co., Ltd.
Overview
Solution overview
The company has accumulated substantial project experience in metro station entrances, underground pedestrian crossings, and underground connecting passages. It can provide rectangular pipe jacking technical services for typical challenges such as shallow cover, close-proximity crossings, maintaining road traffic during construction, and dense existing utility networks. These solutions focus on alignment control, settlement control, waterproofing, and construction organization under complex underground obstruction conditions.
公司在地铁出入口、人行过街通道、地下连接通道等项目方面积累了较多工程案例,可围绕浅埋、近距离穿越、道路不断交施工、既有管线密集等典型难点,提供矩形顶管施工技术服务。方案重点关注轴线控制、沉降控制、防水处理以及复杂地下障碍条件下的施工组织。
Scope
Solution scope
Key components that may be provided for relevant engineering scenarios.
- Support for shallow-cover construction challenges
- Technical services for close-proximity crossings
- Alignment control and settlement control support
- Waterproofing-related construction coordination
- 支持浅埋施工难点
- 支持近距离穿越技术服务
- 支持轴线控制和沉降控制
- 支持防水处理相关施工配合
Scenarios
Application scenarios
Typical project conditions where this offering may be relevant.
- Metro station entrances
- Underground pedestrian crossings
- Underground parking connection passages
- Municipal underground walkway systems
- 地铁车站出入口
- 地下人行过街通道
- 地下车库连接通道
- 市政配套地下步行系统
Technical Information
Technical parameters
Technical approach
- The jacking scheme is developed according to structural condition, support arrangement, target elevation, and construction-stage constraints.
- Hydraulic jacking, temporary support, staged lifting, and monitoring are coordinated to control structural response during elevation adjustment.
- Jacking sequence, load transfer, and support replacement measures should be confirmed through project-specific assessment and design.
Key control items
- Structural safety before, during, and after jacking.
- Jacking synchronization, elevation control, and deviation correction.
- Temporary support stability and load transfer path.
- Monitoring of settlement, deformation, and support conditions.
技术参数
技术实施要点
- 顶升方案应结合结构状态、支撑条件、目标高程和施工阶段约束进行确定。
- 通过液压顶升、临时支撑、分阶段顶升和施工监测协同控制结构响应。
- 顶升顺序、荷载转换和支座更换措施应结合具体项目评估和设计确定。
重点控制内容
- 顶升前、顶升中和顶升后的结构安全。
- 顶升同步性、高程控制与偏差纠正。
- 临时支撑稳定性和荷载传递路径。
- 沉降、变形和支撑状态监测。
Supplier Offerings
Other offerings from this supplier
PROFESSIONAL SERVICES
Large-Section Rectangular Pipe Jacking Technical Services
大断面矩形顶管施工技术服务
View Details
PROFESSIONAL SERVICES
Full-Process Technical Support for Rectangular Pipe Jacking Projects
矩形顶管项目全流程技术支持
View Details
INTEGRATED SOLUTIONS
Rectangular Pipe Jacking Solutions for Urban Utility Tunnels
城市综合管廊矩形顶管解决方案
View Details
PROFESSIONAL SERVICES
Technical Services for Bundled Pipe-Curtain / Rectangular Pipe-Curtain Structures
束合管幕/矩形管幕结构施工技术服务