Home/Products & Services/Shield Tunnel Daily Structural Defect Maintenance and Preservation Services

Engineering Service

Shield Tunnel Daily Structural Defect Maintenance and Preservation Services

盾构隧道日常结构病害维保服务

Condition-led maintenance for operating tunnels, covering staged leakage sealing, segment and lining repair, track-bed void treatment, drainage restoration and deformation-sensitive micro-disturbance grouting.

结合病害检测和工况评估,提供运营隧道渗漏治理、接缝与裂缝修复、管片掉块修补、道床脱空处理、排水整治,以及分层分次微扰动注浆加固。

Supplied by Wuhan Jingsui Technology Co., Ltd.

View Supplier Profile

Overview

Service overview

Jingsui’s maintenance service addresses seepage, movement-joint leakage, segment and secondary-lining cracks, concrete spalling, track-bed hollows, local structural damage and drainage issues in operating metro and shield tunnels. Inspection identifies the defect and informs selection of the appropriate repair, from local patching and sealing to structural bonding and void filling.

Leakage treatment covers investigation, classification, material selection, staged sealing, quality checks and follow-up maintenance. Micro-disturbance grouting uses deep and shallow holes, small injection volumes, multiple passes and staggered positions to limit movement during void treatment. The AGT equipment range and smart controls for pressure, flow and displacement are in development.

TJS jet grouting is an option for selected confined tunnel sites. It uses pressure-balanced slurry discharge to control movement during ground improvement. Feasibility and grouting parameters depend on ground conditions, structural limits and the project monitoring plan.

精隧面向运营地铁及盾构隧道的常见结构病害提供针对性维修养护,涵盖渗漏水、变形缝渗漏、管片与二衬裂缝、管片掉块破损、道床轨枕及脱空、排水系统和局部孔洞等问题。其工艺逻辑是先检测定位和判定病害原因,再结合裂缝形态、含水状况、结构变形与列车运营条件选取封堵、灌浆、结构胶修补、衬砌修复或地层加固措施,并在完成施工后开展检查复核。

渗漏治理包括调查、检测分级、材料选型、分层封堵、质量复核和后期维护。壁后及地层脱空治理采用“深浅结合、少量、多次、交错”的微扰动注浆,并监测结构变形。狭小隧道空间可按地质和施工条件选用TJS微扰动成桩,通过高压射流和排浆压力控制形成水泥土加固体。

AGT注浆装备及配套智能控制功能正在研发,重点包括变频注浆、压力与流量联动、位移监测及施工记录。

Scope

Service scope

Key components that may be provided for relevant engineering scenarios.

  • Leak path investigation, severity classification and compatible repair-material selection
  • Pressure-injection leakage sealing and ring/longitudinal or deformation-joint treatment
  • Segment/secondary-lining crack sealing, spall patching and localized structural restoration
  • Track-bed sleeper support and void/hollow treatment
  • hole plugging and drainage channel works
  • Behind-lining grouting and staged micro-disturbance injection with movement observations
  • Selected confined-space TJS ground improvement, construction documentation and post-repair reviews
  • 渗漏路径调查、病害分级及适配材料选型
  • 注浆堵漏、环纵缝及结构变形缝处理
  • 管片和二衬裂缝封闭、掉块破损修补及局部结构恢复
  • 道床轨枕支承和脱空治理、孔洞封堵及排水沟引流
  • 壁后注浆、分层分次微扰动注浆及结构位移观察
  • 适用条件下的隧道狭小空间TJS地层加固、施工记录与修复复检

Scenarios

Applicable project scenarios

Typical project conditions where this offering may be relevant.

  • Routine maintenance of operating metro tunnels within restricted track-access windows
  • Water ingress through construction joints, cracks and tunnel ring/longitudinal joints
  • Segment spalling, edge damage, secondary-lining cracks and local deterioration
  • Track-bed hollows, loss of support and behind-lining void remediation
  • Settlement/deformation-sensitive strengthening requiring monitored staged grouting
  • 运营地铁隧道及有限天窗内的日常维修养护
  • 施工缝、裂缝及管片环纵缝渗漏水治理
  • 管片掉块、缺角、局部损坏与二衬裂缝修复
  • 道床空鼓、支承不足及衬砌壁后脱空处理
  • 对沉降或收敛变化敏感区段的分次注浆与地层补强

Offering Details

Technical Details & Applications

Typical Defects and Work Items

Routine maintenance covers leakage, movement joints, cracks in segments and secondary linings, spalling, hollows beneath track beds and sleepers, evacuation-platform supports, drainage channels and local hole sealing. Depending on the defect, work can include drilling, packer installation, epoxy filling, grinding, mortar repair, channel formation and substrate restoration.

Six-Stage Leakage Treatment

  1. Investigation and planning — locate seepage, examine water and structural conditions, grade treatment urgency.
  2. Inspection and classification — use visual and suitable instruments to trace leakage paths.
  3. Material matching — choose product by movement, moisture, reaction time and strength requirements.
  4. Site treatment — prepare substrate, install packers and execute staged sealing/injection.
  5. Verification — perform leakage and quality checks suitable to the project.
  6. Follow-up — review repaired areas, drainage and recurrence.

技术说明与应用案例

1. 典型病害与治理内容

日常维保包括渗漏水治理、变形缝处理、管片及二衬裂缝修复、掉块修补、道床及轨枕脱空治理、疏散平台及支座处理、排水引流和区间孔洞封堵。根据病害类型,可采用钻孔埋嘴、注浆、环氧填充、打磨、胶泥修补、开槽或基面恢复。

2. 渗漏治理六阶段

  1. 查勘与方案 — 渗漏位置、踏勘记录、水质和结构状态调查;分级治理与材料适配分析
  2. 检测与分级 — 目视与红外、超声、影像等方法结合,识别裂缝及渗漏路径
  3. 材料选型 — 区分变形缝、潮湿细裂缝、突发涌水、结构补强等工况,考虑渗透、伸长、粘接、凝胶及环境条件
  4. 现场封堵 — 基面清理、裂缝扩槽、钻孔埋嘴、分级压力灌注、底层/中层/面层分层治理
  5. 质量复核 — 结合项目要求采用密封性检查、影像/红外复测和必要的力学检测
  6. 后期维护 — 定期检查修复区、复发渗漏、排水状况及结构变化

Drilling at a tunnel defect repair site

隧道病害修复现场钻孔

Drilling at a tunnel defect repair site

Drilling at a tunnel defect repair site

Drilling at a tunnel defect repair site

隧道病害修复现场钻孔

Crack injection and sealing works

裂缝注浆封堵施工

Crack injection and sealing works

Crack injection and sealing works

Crack injection and sealing works

裂缝注浆封堵施工

Micro-Disturbance Injection

Micro-disturbance grouting combines deep and shallow holes, limited injection volumes, multiple passes and staggered positions. The workflow includes setting out, initial drilling, collar and valve installation, secondary drilling, behind-lining injection, injection tube installation, staged low-disturbance grouting and hole sealing. Pressure, flow, injected volume and tunnel movement are monitored. Dual-channel control, automatic shutoff and cloud logging are in development.

3. 微扰动注浆工艺

微扰动注浆遵循“深浅结合、少量、多次、交错”原则。典型工序为放样→一次钻孔→安装孔口管和球阀→二次钻孔→壁后注浆→打设注浆管→分层分次注浆→封孔。施工监测包括注浆压力、流量、注入量及管片收敛或位移。双通道控制、自动止浆和云端施工记录功能处于研发阶段。

Grouting works and equipment at a tunnel site

隧道现场注浆施工及设备

Grouting works and equipment at a tunnel site

Grouting works and equipment at a tunnel site

Grouting works and equipment at a tunnel site

隧道现场注浆施工及设备

Grout injection pump

注浆泵设备

Grout injection pump

Grout injection pump

Grout injection pump

注浆泵设备

Confined-Space TJS Ground Improvement

TJS jet grouting forms horizontal, vertical or inclined cement-soil reinforcement elements from within confined tunnel spaces. High-pressure slurry cuts and mixes the soil, and controlled discharge balances pressure to limit movement of the surrounding ground and lining. Suitability depends on geology, structural limits, access and the monitoring plan.

Materials and Documentation

Elastic and modified epoxies or hydrophobic and hydrophilic polyurethane grouts are selected by moisture and expected joint movement. Structural adhesives and low-viscosity epoxy grouts are used for segment repair, track-bed voids and behind-lining injection. Handover records can include survey findings, material batches, injection locations, pressure and flow logs, photographs and post-repair checks.

Representative projects

Representative project applications include civil maintenance works for operating rail transit lines in Wuhan, emergency maintenance support for Zhengzhou Metro Line 5, and comprehensive improvement works for Wuhan Rail Transit Line 1 during the Military World Games support period.

4. 狭小空间TJS微扰动成桩

TJS工艺可在狭小隧道内布置水平、垂直或倾斜的加固体。高压浆液切削并搅拌土体,通过排浆调节地层压力,控制周边地层及衬砌变形,形成水泥土加固体。工法选用依据地层、结构允许变形、施工可达性及监测条件确定。

5. 专用材料及施工交付

防水堵漏按基面含水条件及接缝位移选用弹性环氧、改性环氧或疏水、亲水型聚氨酯。管片修补、道床脱空和壁后灌注分别选用对应的结构胶及低黏度灌浆材料。交付记录可包括勘察结果、材料批次、注浆孔位、压力与流量、施工照片和完工检查结果。

代表性工程案例

代表性项目应用包括武汉市轨道交通运营线路土建维保工程、郑州市轨道交通5号线应急维保支持,以及军运会期间轨道交通1号线综合整治工程施工支持。