Full-Rotation Pile Foundation and Retaining Pile Construction

全回转桩基与围护桩施工服务

Construction services for pile foundations, retaining piles, secant piles, and rotary-drilling works in complex underground engineering conditions.

面向桩基、围护桩、咬合桩及旋挖配合施工等复杂地下工程场景的施工服务。

Supplied by Shanghai Qinuo Construction Engineering Co., Ltd.

View Supplier Profile

Overview

Service overview

This service covers pile foundation and retaining pile construction using full-rotation casing and rotary drilling methods where applicable. It is suitable for projects involving backfilled stone layers, complex strata, retaining systems, secant piles, and foundation works requiring controlled construction.

该服务面向桩基与围护桩施工场景,可结合全回转全套筒、旋挖等工艺开展施工组织与现场实施,适用于回填块石层、复杂地层、围护结构、咬合桩及基础工程等施工条件。

Scope

Service scope

Key components that may be provided for relevant engineering scenarios.

  • Full-rotation casing construction capability
  • Rotary drilling coordination when required
  • Suitable for complex underground conditions
  • Support for retaining and foundation works
  • Construction planning adapted to site constraints
  • 具备全回转全套筒施工能力
  • 可结合旋挖设备协同施工
  • 适用于复杂地下工程条件
  • 支持围护与基础工程施工
  • 可根据场地约束进行施工组织

Scenarios

Applicable project scenarios

Typical project conditions where this offering may be relevant.

  • Pile foundation construction
  • Retaining pile works
  • Secant pile retaining systems
  • Full-rotation casing construction
  • Rotary drilling support
  • Complex ground and backfilled-stone conditions
  • 桩基施工
  • 围护桩施工
  • 咬合桩围护体系
  • 全回转全套筒施工
  • 旋挖配合施工
  • 复杂地层及回填块石层施工

Technical Information

Technical parameters

  • Available equipment information includes full-rotation drilling rigs including DTR1605, DTR2005, DTR2106, and DTR2605, and rotary drilling equipment including XCMG XR400E
  • Project-specific pile diameter, depth, strength, and construction parameters should be determined according to actual project conditions

技术参数

  • 可配置全回转钻机包括盾安DTR1605、DTR2005、DTR2106、DTR2605,旋挖设备包括徐工XR400E。
  • 具体桩径、深度、强度和施工参数应根据项目条件确认。

Supplier Offerings

Other offerings from this supplier

Construction application

INTEGRATED SOLUTIONS

Obstacle Removal and Pile Extraction Construction

清障拔桩施工服务

Obstacle RemovalPile ExtractionUnderground ClearanceFoundation Obstruction TreatmentConstruction PreparationUrban Renewal Works

View Details

Construction application

INTEGRATED SOLUTIONS

Circular Pipe Jacking Construction Services

圆形顶管施工服务

Circular Pipe JackingTrenchless ConstructionMunicipal Pipeline WorksUnderground Utility InstallationPipe Jacking ServiceUrban Infrastructure

View Details

Construction application

INTEGRATED SOLUTIONS

Rectangular Pipe Jacking and Utility Tunnel Construction

矩形顶管与管廊施工服务

Rectangular Pipe JackingUtility Tunnel ConstructionTrenchless Box JackingUnderground Corridor WorksMunicipal InfrastructureUrban Underground Space

View Details

Caisson Sinking and VSM Shaft Construction Services image

INTEGRATED SOLUTIONS

Caisson Sinking and VSM Shaft Construction Services

沉井与VSM竖井施工服务

Caisson SinkingVSM Shaft ConstructionVertical Shaft WorksShaft Excavation SupportUnderground Access ShaftsMechanical Shaft Construction

View Details

INTEGRATED SOLUTIONS

Pipe Roofing and Underground Engineering Integrated Solutions

管幕与地下工程综合施工解决方案

Pipe RoofingUnderground Integrated SolutionsPre-Support SystemsTrenchless Underground WorksUrban Underground EngineeringProject Delivery

View Details