The 9.9 m × 8.15 m rectangular pipe jacking machine for the Luxiang Road–Qilianshan Road link in Shanghai.
Engineering Service
Large-Section and Mega-Section Rectangular Pipe Jacking
大型及超大断面矩形顶管工程
Integrated rectangular pipe jacking services for large-section and mega-section underground passage construction, from equipment configuration and planning to field execution.
面向大型及超大断面地下通道建设,提供从设备配置、施工策划到现场实施的矩形顶管专业服务。
Supplied by Shanghai Dashou Construction Technology Co., Ltd.
Overview
Service overview
Integrated rectangular pipe jacking services for large-section and mega-section underground passage construction, from equipment configuration and planning to field execution. Equipment and construction planning are configured according to section size, drive length, ground conditions, cover depth, surrounding constraints, and site conditions.
面向大型及超大断面地下通道建设,提供从设备配置、施工策划到现场实施的矩形顶管专业服务。 结合项目断面、顶进长度、地层条件、覆土厚度、周边环境及施工场地条件,配置相应矩形顶管设备与施工组织方案。
Scope
Service scope
Key components that may be provided for relevant engineering scenarios.
- Large-section and mega-section rectangular pipe jacking
- Long-distance trenchless underground passage construction
- Equipment matching based on section size, ground conditions, cover depth, and site constraints
- Applicable to rail transit, municipal works, underground space, and integrated passage projects
- 大型及超大断面矩形顶管施工
- 长距离、大断面非开挖地下通道施工
- 根据项目断面、地层、覆土和场地条件进行设备匹配
- 适用于轨交、市政、地下空间及综合通道工程
Scenarios
Applicable project scenarios
Typical project conditions where this offering may be relevant.
- Large-section road underpasses and municipal passages
- Metro tunnels and interchange sections requiring large rectangular cross-sections
- Long-distance underground links and urban connectivity projects
- Stormwater storage conduits constructed using rectangular pipe jacking
- 大型断面道路下穿通道及市政通道
- 采用大断面矩形结构的轨道交通隧道及换乘段
- 长距离地下连通道及城市交通连通工程
- 采用矩形顶管法施工的雨水调蓄管道
Offering Details
Technical Details & Applications
Construction configuration
Dashou provides equipment configuration, construction planning, and field execution for large-section and mega-section rectangular pipe jacking. Machine selection and construction arrangements are tailored to the required cross-section, drive length, ground conditions, soil cover, surrounding infrastructure, and site constraints.
Luxiang Road–Qilianshan Road Link, Shanghai
The project used a 9.9 m × 8.15 m rectangular jacking section for two drives, each 445 m long, with a separation of 10 m. The alignment passed beneath Gucun Park and the S20 Outer Ring Expressway. Soil cover beneath the expressway was approximately 3.3 to 3.95 m, compared with approximately 3.65 to 5.5 m elsewhere along the alignment. The project combined long-distance jacking, a large cross-section, and shallow-cover construction beneath an expressway.
技术说明与应用案例
施工配置
大收面向大型及超大断面矩形顶管工程,提供设备配置、施工策划及现场实施服务。根据工程所需断面、顶进长度、地层条件、覆土厚度、周边设施及场地条件,确定相应顶管设备和施工组织方案。
上海陆翔路—祁连山路贯通工程
采用9.9 m × 8.15 m矩形顶管断面,共两条顶进线路,每条长445 m,两条线路间距10 m。顶管下穿顾村公园及S20外环高速,其中高速公路下穿段覆土厚度约3.3至3.95 m,其余区段约3.65至5.5 m。项目同时涉及长距离、大断面及高速公路下方浅覆土施工。
9.9 m × 8.15 m rectangular pipe jacking machine for the Luxiang Road–Qilianshan Road Link, Shanghai
上海陆翔路—祁连山路贯通工程,9.9 m × 8.15 m矩形顶管机
Provincial Hospital–Dongmen Section, Fuzhou Metro Line 4
This metro interchange section used a 10.8 m × 7.5 m rectangular jacking section over a single drive of 190.423 m. The alignment passed through soft muddy strata with approximately 10 m of soil cover and ran longitudinally beneath Dongda Road, a major urban road. The project involved large-section metro tunnel construction alongside existing buildings and urban infrastructure.
福州地铁4号线省立医院站—东门站区间
该地铁换乘段采用10.8 m × 7.5 m矩形顶管断面,单次顶进长度190.423 m。顶管穿越淤泥层,覆土厚度约10 m,并沿东大路交通主干道纵向下穿。项目涉及大断面地铁隧道施工,以及沿线既有建筑和城市基础设施条件下的工程实施。
Joint sealing inside the rectangular pipe jacking tunnel, Fuzhou Metro Line 4
福州地铁4号线矩形顶管隧道内部管节嵌缝施工
Sunqiao Initial Stormwater Storage Conduit, Shanghai
The project used a 7.7 m × 7.3 m rectangular jacking section for a 135 m-long conduit providing 5,600 m³ of stormwater storage. Soil cover ranged from approximately 6.4 to 7.75 m, and the drive followed a 1% upward gradient. The alignment lay between Hengmian Port and nearby residential buildings, demonstrating the use of large-section rectangular pipe jacking for urban stormwater storage infrastructure.
上海孙桥初期雨水调蓄管道工程
采用7.7 m × 7.3 m矩形顶管断面,顶进长度135 m,形成调蓄规模5,600 m³的雨水调蓄管道。覆土厚度约6.4至7.75 m,以1%上坡顶进。顶管线路位于横沔港与周边住宅楼之间,体现了大断面矩形顶管在城市雨水调蓄设施建设中的应用。
Breakthrough of the 7.7 m × 7.3 m rectangular pipe jacking tunnel for the Sunqiao stormwater storage project, Shanghai
上海孙桥初期雨水调蓄工程,7.7 m × 7.3 m矩形顶管贯通
Related Products & Solutions
关联产品与解决方案
Automatically selected based on supplier, category, keywords and offering type.
PROFESSIONAL SERVICES
Rectangular Pipe Jacking for Metro Access Tunnels and Underground Passages
轨道交通出入口与地下连通道矩形顶管
View Details
PROFESSIONAL SERVICES
Rectangular Pipe Jacking for Complex Urban Crossings
复杂城市穿越矩形顶管工程
View Details
PROFESSIONAL SERVICES
Rectangular Pipe Jacking Equipment Configuration and Engineering Support
矩形顶管设备配置与工程技术支持
View Details